Special Collections Department
403 Parks Library
Iowa State University
Ames, IA 50011-2140
MS 69
Sioux Electric Cooperative Association
Records, 1938-1985, n.d.
creator: | Sioux Electric Cooperative Association |
title: | Records |
dates: | 1938-1985 |
extent: | 2.1 linear ft. (5 document boxes) |
collection number: | MS 69 |
repository: | Special Collections Department, Iowa State University. |
access: | Open for research |
publication rights: | Consult Head, Special Collections Department |
preferred citation: | Sioux Electric Cooperative Association Records, MS 69, Special Collections Department, Iowa State University Library. |
The Sioux Electric Cooperative Association received its charter from the state of Iowa on July 18, 1938. The Association was sponsored by the Sioux County Farm Bureau and the Extension Service. In 1935 President Roosevelt had signed an executive order creating the Rural Electrification Administration (REA), which facilitated the creation of rural electric cooperatives throughout the nation and hastened the construction of electric lines to people living in rural areas. The contract for the first line construction of 228 miles to serve 400 members was made in October, 1938. In 1993 Sioux Electric Cooperative Association merged with O'Brien County Rural Electric Cooperative and became North West Rural Electric Cooperative and in 1998 North West Rural Electric Cooperative was joined by Plymouth Electric Cooperative Association. |
The collection (1938-1985) contains printed materials, construction data and contracts, system study reports, correspondence, and memoranda. The bulk of the material documents the cooperative's early activities during the 1940s and 1950s. For a related collection, please see the Iowa Association of Electric Cooperatives Records (MS 40). |
The collection is organized in chronological order. |
Box |
Folder |
Title |
Dates |
1 |
1 |
REA Rate Handbook: questions and answers |
1938 |
1 |
2 |
Utilization: mostly memoranda |
1938-1940 |
1 |
3 |
Memoranda and form letters |
1938-1940 |
1 |
4 |
Membership tabulations |
1939 |
1 |
5 |
Construction contract: plans and specifications |
1940 |
1 |
6 |
Office of Production Management (see also War Production Board) |
1941-1942 |
1 |
7 |
REA: war regulations bulletins |
1942-1943 |
1 |
8 |
Orders: priority rating given |
1943 |
1 |
9 |
REA: priorities and items of interest |
1943-1945 |
2 |
1 |
Orders: priority rating given |
1944 |
2 |
2 |
War Production Board (WPD) Construction Approvals |
1944 |
2 |
3 |
Unit Sheets and County War Board Approval |
1944 |
2 |
4-6 |
Unit Sheets: construction 1-3 |
1944 |
3 |
1 |
Construction contract, Part 1, for REA distribution project- final sheets |
1944 |
3 |
2 |
Construction Contract, Part 2, for REA distribution project-plan and specifications |
1945 |
3 |
3 |
Lists of Customers: 85 Mile Contract |
1945 |
3 |
4 |
Orders: priority rating |
1945-1946 |
3 |
5 |
System Study Report for the Electrical Distribution System of the Sioux Electric Cooperative Association (SECA) |
1948 |
3 |
6 |
Copy of System Study Report for the Electrical Distribution System of the Sioux Electric Cooperative Association (SECA) - this copy contains variations and correspondence |
1948-1952 |
4 |
1 |
Preliminary System Study Report |
1952 |
4 |
2-3 |
System Study Report (two copies) |
1952 |
4 |
4 |
Recapitulation of Recommended Line Construction and Estimated Cost and Summary of System Improvements for Interim and Future Systems |
1952 |
4 |
5 |
Plans/Specifications for SECA Headquarters and Service Building |
1954 |
5 |
1 |
Specifications for Headquarters and Service Building - two Sections |
1954 |
5 |
2 |
Sectionalizing Study Report |
1956 |
5 |
3 |
Preliminary Report Long Range System Plan |
1958 |
5 |
4 |
Specifications and Plans for an Addition to the Headquarters and Service Building |
1961 |
5 |
5 |
Sioux Electric Celebrates 50 Years of Rural Electrification (1935-1985) |
1985 |